Kwinana Residue Storage Facility H Lake Conversion

Client
Alcoa
Construction site
Perth, WA
Period
2021
Market
Mining

KAEFER was engaged by Alcoa to undertake various civil, fabrication, structural, mechanical, piping, electrical & instrumentation services as part of the H Lake Conversion Project.

Our Scope
  • Management and delivery from ECI through to design, construction and handover including commissioning.
  • Management of civil and concrete works (excavation and detailed earthworks), including installation of footings for STOF tank and bunding around tank & pumps, along with supply & installation of boxed culverts for pipework under roads. Civil Design was completed by Client.
  • SMP detailed design including MTO (with nominated engineer) for tank & pump station.
  • Supply and install 12m-high tank and pump station, including modifications to existing pipelines and services. This included approx. 1.6km of piping installation and 1km of 500NB piping for the feed line. This also included supply & installation of new super thickener overflow (STOF) pipeline and new STOF tank and associated pipework, supply & installation of steel platforms & access platforms and supply & installation of valves.
  • Management of EIC scope (supply & install), including removal of redundant cabling. Installation for EIC included the starter module, motor protection relays, termination lugs, glands, junction boxes, PLC cabinet, fibre optic cabling, mag flow, control valve, float switches, level transmitters, cable trays, conduits and instrument distribution board. Additional scope included supply and installation of power and control cables, supply & installation of area lighting and earthing.
  • Testing & commissioning.