Geraldton Port – Berth 5 Shiploader Access Stairway

Client
Mid West Ports Authority
Construction site
Geraldton, WA
Period
2019
Market
Marine
KAEFER services
Mechanical Services
Surface Protection

KAEFER was engaged by the Mid West Ports Authority to undertake the replacement of the access stairway for the Berth 5 Shiploader at the Geraldton Port.

Our Scope
  • Supply, fabrication and surface treatment of new steelwork
  • Supply of handrails, mesh and treads
  • Removal of existing stairway and installation of new stairway

KAEFER Integrated Services
Delivering across full asset lifecycles, from construction to asset integrity, maintenance & shutdowns.
Contact us now +61 8 9224 4600

Further Case Studies