Geraldton Port – Berth 5 Shiploader Access Stairway
KAEFER was engaged by the Mid West Ports Authority to undertake the replacement of the access stairway for the Berth 5 Shiploader at the Geraldton Port.
Our Scope
- Supply, fabrication and surface treatment of new steelwork
- Supply of handrails, mesh and treads
- Removal of existing stairway and installation of new stairway