KAEFER was engaged by Downer to assist with installation of cryogenic insulation for the jetty lines (supply and return) on the Gorgon LNG Project.
Our Scope
Works were on a critical path for the end Client (Chevron) and KAEFER worked closely with Downer to successfully complete these works on schedule.
KAEFER also undertook on-site fireproofing works as well as off-site surface protection works to the jetty superstructure and pipe spools as part of separate packages.