Gorgon LNG Project Jetty Works

Client
Downer
Construction site
Barrow Island, WA
Period
2015-2016
Market
Energy
KAEFER services
Insulation & Cladding
Surface Protection
Passive Fire Protection

KAEFER was engaged by Downer to assist with installation of cryogenic insulation for the jetty lines (supply and return) on the Gorgon LNG Project.

Our Scope

Works were on a critical path for the end Client (Chevron) and KAEFER worked closely with Downer to successfully complete these works on schedule.

KAEFER also undertook on-site fireproofing works as well as off-site surface protection works to the jetty superstructure and pipe spools as part of separate packages.

KAEFER Integrated Services
Delivering across full asset lifecycles, from construction to asset integrity, maintenance & shutdowns.
Contact us now +61 8 9224 4600

Further Case Studies