Daunia CHPP Installation

Client
Sedgman Limited
Construction site
Daunia Mine, Queensland
Period
2012 – 2013
Market
Mining

KAEFER (through acquired business G&S) was engaged to undertake the Structural, Mechanical, Piping and Electrical Instrumentation (SMPE&I) installation of the Coal Handling and Preparation Plant (CHPP).

Our Scope

Opened in 2013, Daunia Mine located in Queensland’s Bowen Basin produces approximately 4.5 million tonnes per annum (Mtpa) of coal with an expected 30 year life.

KAEFER was engaged to undertake the Structural, Mechanical, Piping and Electrical Instrumentation (SMP&EI) installation of the Coal Handling and Preparation Plant (CHPP) including:

  • ROM bin including feeder breaker;
  • Raw coal sizing station including secondary sizer, roller screen and tertiary sizer;
  • Two product processing system; spirals and microcel flotation;
  • Rejects disposal system including coarse rejects bin and separate rejects belt press filter building;
  • Two thickeners – welded type;
  • Two radial stackers;
  • Coal valves product reclaim via four coal valves; and
  • High voltage and Electrical and instrumentation installation.

We supplied all construction equipment, cranage, supervision and labour required for the project including commissioning support labour spanning pre-commissioning through to wet commissioning and handover.


All plant was delivered on time, without any injuries.