Darwin LNG Maintenance

Client
Santos
Construction site
Darwin, NT
Period
2021-Ongoing
Market
Energy

KAEFER was engaged to provide multidisciplinary maintenance services at the Darwin LNG Facility.

Our Scope
  • Mechanical Services – On-site works as well as off-site fabrication support
  • Fabric Maintenance – Insulation & Cladding, Surface Protection and Rope Access
  • Scaffolding Services

KAEFER has provided these assets across various infrastructure at the site, including the process plant, storage tanks and jetty.

KAEFER Integrated Services
Delivering across full asset lifecycles, from construction to asset integrity, maintenance & shutdowns.
Contact us now +61 8 9224 4600

Further Case Studies