Cataby Minesite Tails Stackers
KAEFER was engaged to supply two tails stackers for the new mine site at Cataby.
Our Scope
- Produce general arrangements and fabrication drawings
- Supply, fabricate and surface treatment of tails stacker components
- Supply all piping as required (HDPE and steel rubber lined)
- Transport all items to site
- Provide labour to assemble stackers on site