Wheatstone LNG Project Offshore Works

Client
Clough
Construction site
Offshore Western Australia
Period
2015-2017
Market
Energy
KAEFER services
Access Solutions
Insulation & Cladding
Surface Protection
Passive Fire Protection

KAEFER was engaged by Clough for works on the Wheatstone LNG Project Hook-up & Commissioning by Clough in 2015.

Our Scope
  • Installation, removal and repair and technical assistance in re-engineering specifications
  • Custom fabrication of valve boxes
  • Application of various protective coating systems including passive fire protection (Chartek 7), main deck coatings, stainless steel passivation, UHP and abrasive blasting surface preparation and coatings removal
  • Working from various access systems such as rope access and working in confined spaces

KAEFER’s team was recognised by the end-Client for their performance on this project, receiving the overall Project Director’s Award from Chevron.

KAEFER Integrated Services
Delivering across full asset lifecycles, from construction to asset integrity, maintenance & shutdowns.
Contact us now +61 8 9224 4600