Red Mountain Reflux Classifier Project

Client
BHP Billiton Mitsubishi
Alliance (BMA)
Construction site
Bowen Basin, QLD
Period
May 2013 – August 2013
Market
Mining

KAEFER (formerly G&S Engineering Services) was responsible for installation of two new reflux classifiers at Red Mountain CHPP.

Our Scope

G&S was responsible for the installation of two new reflux classifiers and associated tie-in works for the Red Mountain coal handling and processing plant (CHPP).

The scope of work included the structural installation of two new reflux classifiers and fitting and installing the following:

  • Product pump and sump;
  • Reject pump and sump;
  • Fluidisation water tank;
  • Oversize protection screen as well as the modification to the support under TP-203; and
  • Clarified water reducer spool.