HomePerenjori Chute Replacements Perenjori Chute Replacements Client CBH Group Construction site Perenjori, WA Period 2018 Market Infrastructure KAEFER services Mechanical ServicesAccess Solutions KAEFER was engaged by CBH Group to provide structural and mechanical services at CBH’s Perenjori site. Our Scope Access servicesRemoval of existing chutesSupply and installation of new chutes KAEFER Integrated Services Delivering across full asset lifecycles, from construction to asset integrity, maintenance & shutdowns. Contact us now +61 8 9224 4600 Further Case Studies Alcan Gove Maintenance KAEFER was awarded the contract to provide ongoing maintenance services at the Site. Cataby Minesite Tails Stackers KAEFER was engaged to supply two tails stackers. Caval Ridge Stacker & Reclaimers Installation KAEFER (through acquired business G&S) undertook the Structural, Mechanical, Piping, Electrical & Instrumentation (SMPE&I) installation works for the coal stackers and reclaimers Cooper Basin Maintenance KAEFER is engaged to provide multidisciplinary maintenance services at the client’s Cooper Basin assets in South Australia. Coorow Horizontals Refurbishment KAEFER was engaged by to undertake sealing works at the Storage Facility. Dampier High Hang-up Overhead Protection The project comprised the design, supply and installation of overhead protection from falling high hang up product. Darwin LNG Dolphins Remediation KAEFER was engaged for remediation works to structural steel on berthing and mooring dolphins. Darwin LNG Maintenance KAEFER was engaged to provide multidisciplinary maintenance services at the Darwin LNG Facility. Daunia CHPP Installation KAEFER (through acquired business G&S) was engaged to undertake the SMPE&I installation of the Coal Handling and Preparation Plant (CHPP). Esso Australia Maintenance KAEFER was engaged for maintenance, campaign maintenance and shutdown services at offshore and onshore assets.