KAEFER was engaged to complete various structural, mechanical & piping works for the thickener at the Karara Mine.
Our Scope
- Fabrication & installation of rubber-lined carbon steel pressure piping, DN350 to DN600
- Fabrication & installation of DN120 Lobster Backs
- Site fabrication & installation of stainless steel pressure piping – 700m
- Site fabrication & installation of HDPE Piping – 1.5km
- Installation of structural steel, piping supports & slurry pumps