KAEFER was engaged to complete various structural, mechanical & piping works for the thickener at the Karara Mine.

Our Scope
  • Fabrication & installation of rubber-lined carbon steel pressure piping, DN350 to DN600
  • Fabrication & installation of DN120 Lobster Backs
  • Site fabrication & installation of stainless steel pressure piping – 700m
  • Site fabrication & installation of HDPE Piping – 1.5km
  • Installation of structural steel, piping supports & slurry pumps

KAEFER Integrated Services
Delivering across full asset lifecycles, from construction to asset integrity, maintenance & shutdowns.
Contact us now +61 8 9224 4600