Karara Mine Project SMP Works

Client
Karara Mining
Construction site
Midwest Region, WA
Period
2014
Market
Mining

KAEFER was engaged to complete various structural, mechanical & piping works for the Karara Mine Project across the Thickener and Dewatering Circuit.

Our Scope

Thickener

  • Fabrication & installation of rubber-lined carbon steel pressure piping, DN350 to DN600
  • Fabrication & installation of DN120 Lobster Backs
  • Site fabrication & installation of stainless steel pressure piping – 700m
  • Site fabrication & installation of HDPE Piping – 1.5km
  • Installation of structural steel, piping supports & slurry pumps

Dewatering Circuit

  • Fabrication & installation of hoppers & cyclone overflow hoppers for 4 cyclone banks
  • Fabrication & installation of rubber-lined carbon steel pressure piping (DN600), including cyclone overflow, screen bypass, pumping suction piping & manifolds, underflow piping & discharge piping
  • Modifications to structural steel and installation of new structural steel to support new equipment
  • Installation of new pumps for circuit
  • Removal of screens pumps & associated redundant equipment
KAEFER Integrated Services
Delivering across full asset lifecycles, from construction to asset integrity, maintenance & shutdowns.
Contact us now +61 8 9224 4600