Coorow Horizontals Refurbishment

Client
CBH Group
Construction site
Coorow, WA
Period
2019
Market
Infrastructure
KAEFER services
Access Solutions
Surface Protection

KAEFER was engaged by CBH Group to undertake sealing works at the Coorow Storage Facility.

Our Scope
  • Roof surface preparation including a high pressure hot water clean of the internal roof cladding and purlins to remove contaminants;
  • Primer application;
  • Poly-Urethane Foam Application and Coating: all roof cladding, purlins, capping and ring gear required totally encased internally with PU foam to a thickness between 20mm to 25mm;
  • External wall refurbishment including a high-pressure water wash of the external walls and sealing of cracking;
  • Floor refurbishment including cleaning and application of a full sealer coat of an acrylic penetrating floor sealer;
  • Painting of a continuous filling line around walls; and
  • Passing a pressure test of empty storage to prove fitness for fumigation.