West Pilbara Structural Integrity Remediation

Client
Rio Tinto
Construction site
Pilbara Region, WA
Period
2019-Ongoing
Market
Mining
KAEFER services
Mechanical Services
Access Solutions
Surface Protection

KAEFER is engaged to undertake structural integrity remediation works at the client’s West Pilbara sites.

Our Scope
  • Abrasive blasting, surface preparation and application of protective coatings (including encapsulation) and subsequent inspection and testing
  • Hazardous protective coating removal
  • Steelwork remediation including welding and replacement of fasteners, bolts, checker plate, floor grating, cover plates, shedder plates, deflector plates and structural steel
  • Concrete and grout replacement and repairs
  • Non-destructive testing

These services are being performed on assets including crushers (primary and secondary), transfer towers, conveyors, tunnels, screening plants, train load outs, reclaimer structures and dust collectors.

Project challenges include

  • Working on an operational site with a large number of open work fronts
  • Planning and integration with Operations
  • Management of multiple work fronts

KAEFER Integrated Services
Delivering across full asset lifecycles, from construction to asset integrity, maintenance & shutdowns.
Contact us now +61 8 9224 4600

Further Case Studies