KAEFER (through acquired business G&S) was engaged to undertake the installation of a new Run of Mine (ROM) and primary sizer station containing secondary and tertiary sizers and a stacker conveyor that will feed an upgraded Train Load Out (TLO) network.
Our Scope
The major work elements associated with this contract included:
- A ROM and primary sizing facility
- Conveyors, gantries, drive stations and transfer chutes
- A secondary/tertiary sizing station
- A fixed stacker at the existing product stockpile
- A new cross belt sampling station
- Modifications to the existing train load out conveyor (CV-04), sampling station and associated services, as well as bin discharge gate and chute
- A compressor and reticulated compressed air system
- Raw / fire water reticulation to the new coal handling facility
- New HV substation and reticulated power
- Prefabricated / transportable LV switchrooms and MCC’s
- Cabling, cable carriers and lighting
- Controls and instrumentation systems
- Civil earthworks and construction of pavements