Rolleston Coal Handling Facility Duplication

Client
Glencore
Construction site
Albinia, QLD
Period
2015
Market
Mining
KAEFER services
Mechanical Services
Electrical Services

KAEFER (through acquired business G&S) was engaged to undertake the installation of a new Run of Mine (ROM) and primary sizer station containing secondary and tertiary sizers and a stacker conveyor that will feed an upgraded Train Load Out (TLO) network.

Our Scope

The major work elements associated with this contract included:

  • A ROM and primary sizing facility
  • Conveyors, gantries, drive stations and transfer chutes
  • A secondary/tertiary sizing station
  • A fixed stacker at the existing product stockpile
  • A new cross belt sampling station
  • Modifications to the existing train load out conveyor (CV-04), sampling station and associated services, as well as bin discharge gate and chute
  • A compressor and reticulated compressed air system
  • Raw / fire water reticulation to the new coal handling facility
  • New HV substation and reticulated power
  • Prefabricated / transportable LV switchrooms and MCC’s
  • Cabling, cable carriers and lighting
  • Controls and instrumentation systems
  • Civil earthworks and construction of pavements
  • Installation of Principal supplied equipment
KAEFER Integrated Services
Delivering across full asset lifecycles, from construction to asset integrity, maintenance & shutdowns.
Contact us now +61 8 9224 4600