Kwinana Pigment Plant Structural Steel Repairs

Client
Tronox
Construction site
Perth, WA
Period
2017
Market
Infrastructure
KAEFER services
Mechanical Services
Access Solutions
Surface Protection

KAEFER was engaged by Tronox to undertake repair and replacement of structural components at the Kwinana Pigment Plant.

Our Scope

The repairs included replacement of corroded handrails, abrasive blasting and painting and mechanical repairs and replacement of structural steel throughout the plant.

The plant was required to remain fully-operational throughout project, requiring careful interface management to ensure minimal disruptions to ongoing operations. KAEFER performed non-destructive testing and 100% visual examinations of all structural components prior to remediation works. The project was successfully completed on-time without any safety incidents.

KAEFER Integrated Services
Delivering across full asset lifecycles, from construction to asset integrity, maintenance & shutdowns.
Contact us now +61 8 9224 4600

Further Case Studies