Kwinana Aluminium Chloride Structure Refurbishment
KAEFER was engaged by Tronox for refurbishment of the U300 Aluminium Chloride Structure at the Kwinana Pigment Plant.
The structure required a full refurbishment due to deterioration as a result of a highly corrosive environment. KAEFER’s scope comprised demolition, remediation and re-cladding of the structure.
Our Scope
- Access services (scaffolding)
- Demolition of redundant structure
- Surface preparation and remediation
- Removal of existing structural steel grating and replacement with FRP
- Removal / replacement of wall cladding and roof sheeting
- Application of protective coatings