Karara Dry Tailings Stacking Facility

Client
FLSmidth Minerals
Construction site
Karara Mine, WA
Period
Apr 2012 – Nov 2012
Market
Mining

KAEFER (formerly G&S) undertook the unloading, full SMP&EI assembly, erection and dry commissioning for the FLSmidth supplied Tailings Stacking Components.

Our Scope

The scope included the civil erection of structures, assembly of mechanical equipment, assembly of electrical equipment and wiring and the assembly of hydraulics for the following:

  • CV 101 – Ramp Conveyor
  • CV 103 – Extendable / Movable Conveyor
  • CV 104 – Mobile Stacking Conveyor
  • CV 105 – Mobile Stacking Tipper
  • CV 105 – Feeder Conveyor
  • CV 106 – Spreader Conveyor

KAEFER was also responsible for the civil design and installation of foundations for the electrical plant.