Ichthys LNG Project Construction

Client
JKC Australia
Construction site
Darwin, NT
Period
2014-2019
Market
Energy
KAEFER services
Mechanical
Access Solutions
Insulation & Cladding
Surface Protection
Passive Fire Protection

KAEFER was engaged across multiple contracts on the Ichthys LNG Project, completing works both on and offshore.

Our Scope

KAEFER’s work spanned a range of infrastructure, including the onshore process plant, storage tanks, jetty, combined cycle power plant and offshore (CPF and FPSO). KAEFER’s scope included the following:

  • Management and supervision of scaffolding on-site
  • Application of cryogenic, thermal and acoustic insulation, as well as sheet metal cladding
  • Installation of removable thermal insulation jackets
  • Surface preparation and application of protective coatings
  • Rope access
  • Passive fire protection application
  • Structural, mechanical & piping works

Works were completed both on-site as well as through KAEFER’s Darwin Workshops.

KAEFER Integrated Services
Delivering across full asset lifecycles, from construction to asset integrity, maintenance & shutdowns.