Gregory Crinum Restart
KAEFER (through acquired business G&S) successfully delivered a range of structural, mechanical, piping, electrical & instrumentation works associated with the mine restart.
Our Scope
G&S delivered integrated Structural Mechanical Piping and Electrical Instrumentation (SMP&EI) refurbishment works across mine infrastructure including a coal handling and preparation plant, treatment facilities, maintenance workshops and administration facilities. The scope included works across the following infrastructure:
- ROM
- Screens & Breakers
- Pumps
- Mag Separators
- 1000 tonne Bin and feeders
- Cyclones
- Centrifuges
- Thickeners (Froth, Tailing)
- Reject Bin
- Stockpile Valves/ feeders
- Turkeys Nest
- Train load out structure
- Conveyors
- Gantry cranes
- Monorails/ Crane Beams
- Air Compressors/ air lines
- Belts and belt filters
- Vacuum Pump
- Laboratory
- Sample Stations
- Floc Plant/ Lime Plant
- Pipework
- Firewater system and tanks
- Water storage & lines
- Micro Cells
- Tailings Dam
- Pit Water Pumps
- Sewerage Treatment Station
- Sumps