Gregory Crinum Restart

Client
Sojitz Coal Mining
Construction site
Emerald, QLD
Period
2018 – 2019
Market
Mining
KAEFER services
Mechanical Services
Electrical Services

KAEFER (through acquired business G&S) successfully delivered a range of structural, mechanical, piping, electrical & instrumentation works associated with the mine restart.

Our Scope

G&S delivered integrated Structural Mechanical Piping and Electrical Instrumentation (SMP&EI) refurbishment works across mine infrastructure including a coal handling and preparation plant, treatment facilities, maintenance workshops and administration facilities. The scope included works across the following infrastructure:

  • ROM
  • Screens & Breakers
  • Pumps
  • Mag Separators
  • 1000 tonne Bin and feeders
  • Cyclones
  • Centrifuges
  • Thickeners (Froth, Tailing)
  • Reject Bin
  • Stockpile Valves/ feeders
  • Turkeys Nest
  • Train load out structure
  • Conveyors
  • Gantry cranes
  • Monorails/ Crane Beams
  • Air Compressors/ air lines
  • Belts and belt filters
  • Vacuum Pump
  • Laboratory
  • Sample Stations
  • Floc Plant/ Lime Plant
  • Pipework
  • Firewater system and tanks
  • Water storage & lines
  • Micro Cells
  • Tailings Dam
  • Pit Water Pumps
  • Sewerage Treatment Station
  • Sumps