Middlemount CHPP Installation

Client
Sedgman Ltd
Construction site
Middlemount, QLD
Period
2009 – 2010
Market
Mining

KAEFER undertook the Structural, Mechanical, Piping (SMP) installation of the Coal Handling and Preparation Plant (CHPP) for the Middlemount Coal Mine.

Our Scope

Commencing operations in 2011, the Middlemount Coal Mine is located in Queensland’s Bowen Basin.

KAEFER undertook the Structural, Mechanical, Piping (SMP) installation of the Coal Handling and Preparation Plant (CHPP) for the Middlemount Coal Mine. KAEFER supplied all construction equipment, cranage, supervision and labour including commissioning support labour required for the project.

The scope included the assembly and installation of:

  • ROM hopper;
  • Raw coal conveyor CV-101;
  • Sizing station ST-101;
  • Plant feed conveyor CV-102;
  • Product conveyor CV-801;
  • Transfer station ST-801;
  • Product stacking conveyor CV-802;
  • Product reclaim conveyor CV-803;
  • Train load-out bin BN-801;
  • Product reclaim tunnel;
  • Rejects bin hopper BN-701; Rejects coal conveyor CV-701; and Coal preparation plant and services.
KAEFER Integrated Services
Delivering across full asset lifecycles, from construction to asset integrity, maintenance & shutdowns.
Contact us now +61 8 9224 4600