Pioneer Sugar Mill Boiler Mechanical Erection

Client
Pioneer Sugar Mill CSR
Construction site
Brandon, QLD
Period
August 2004 – June 2005
Market
Infrastructure

KAEFER (formerly G&S Engineering Services) undertook the SMP erection of a high pressure, high efficiency boiler at the Pioneer Sugar Mill.

Our Scope

KAEFER undertook the structural, mechanical, and piping (SMP) erection of a high pressure, high efficiency boiler capable of operating on both bagasse and coal fuels at Pioneer Mill, which is able to produce nearly 200,000MWh of power.

Executed on a Lump Sum price basis, the installation included KAEFER supplying all construction equipment, cranage, supervision and labour required for the project including commissioning support labour.

The scope includes the assembly and installation of:

  • Bagasse-oil fired boiler;
    -Furnace walls;
    -Bi-Drum Boiler Bank;
    -Pinhole Grate;
    -Alloy Superheater;
    -Soot Blowers;
    -Tubular Air Heater; and
    -Economiser.
  • Interconnecting piping and valving;
  • Piping support steelwork and piperacks; and
  • Ash and dust handling plant and pipework.